The 2026 Second-Half Timeline
Guide · about 10 min · refs checked 2026-11-18 (reference links and dates only)
Official update snapshots: dates, rollout scope and planned shutdowns, with sources; ordered newest event first.
Example and interpretation
A teaching scenario, not a measured or executed site test.
For a new background-task feature, record announcement date, eligible tiers and execution location. Decide whether it changes your choice. Announcement does not establish availability for every account.
How to check your practice
Explain the example in your own words, inspect input constraints, then verify against the source. Revisit concepts if you cannot explain why; supply missing dates, fields or permissions; withdraw unsupported conclusions.
For this topic, start with concept confusion · See all six scenarios and their reasoning
- 官方更新日志(2026-10-21 直抓核验) ↗
- 2026-04-21 发布说明 ↗
- 包含 Atlas 停运与图像 2.0 条目(2026-11-03 取到正文) ↗
- C 端 2026-08-18 退役说明 ↗
- 2026-10-21 直抓核验 ↗
- Opal FAQ: shut down 2026-11-17, Gems closed the same day; no automatic workflow migration (rechecked 2026-11-25) ↗
- 2026 changelog ↗
- 1.6.5,2026-10-25(2026-11-03 复核) ↗
- 2026-10-07。49.1B token ↗
- 2026-10-29 预印本 ↗
- 2026-10-15 ↗
- 2026-10-29 开放权重 ↗
- 2026-10-22 捐赠给 AAIF ↗
- 2026-11-12 上市 ↗
Lesson - AI Capabilities and Limits · How to Ask AI · How to Tell if AI News Is Hype · When Not to Use RAG